EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Serg
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (110)
Research
Workshop
- (3)
-
Trim tabs
-
Kit Arrived
-
Kit Arrived
Empennage
- (4)
-
Elevator Trim
-
Elevator
-
Elevators
-
Horizontal stabilizers
Fuselage
- (62)
Firewall
- (5)
Tail Feathers
Wings
- (10)
Controls
- (10)
Avionics
Lighting
Instrument Panel
Landing Gear
- (8)
Engine
Propeller
Fuel System
- (4)
Interior Finish
- (4)
Paint / Decals
Inspection
Tools
Builder Name:
Sergio Desiati
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
285.2
Start/Last Date:
Aug 31, 2019 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Serg
Home or Last Project Picture
May 24, 2020
Flap controls
- (3.7 hours)
Category: Wings
Replaced all flap hardware with drilled bolts, and castellated nuts. Clearanced flap cables and fittings in wing root; all very close as per plan, but adequate clearance! Pretty happy with that. I also fitted the left wing aileron and flap bearings... five less small loose parts!
9AB582BE-A086-49FA-AC51-A10A4878514B.jpeg
May 11, 2020
Aileron/flap hinges
- (1.7 hours)
Category: Wings
Installed right hand side hinge bearings. Started fitting right hand side aileron hinge brackets.
57515D8D-A918-40D1-81E8-49C2AF1DEA73.jpeg
58E84183-FE57-46BE-BFE4-16B1F606D299.jpeg
May 09, 2020
Windshield
- (3 hours)
Category: Fuselage
Trimmed upper forward skylight/windshield former, trimmed windshield edges to match, bodywork on windshield fiberglass faring.
Also replaced some small aileron linkage hardware.
May 09, 2020
Windshield
- (3 hours)
Category: Fuselage
Trimmed upper forward skylight/windshield former, trimmed windshield edges to match, bodywork on windshield fiberglass faring.
Also replaced some small aileron linkage hardware.
May 07, 2020
Skylight
- (4.1 hours)
Category: Fuselage
Finished skylight today. All good!
281DB3A4-96C3-42D4-9E1E-DEB698E12598.jpeg
4FDA3D86-EDF7-47C1-A884-1996BAC84CA0.jpeg
60F56D54-9458-4D13-82F1-282854355320.jpeg
6955E02A-6A0E-4084-B6DF-285E0C352DA1.jpeg
May 06, 2020
Skylight
- (.9 hour)
Category: Fuselage
Fitted skylight center support. Short day today.
May 04, 2020
Skylight
- (3.7 hours)
Category: Fuselage
Fitted and installed aft skylight former, and dorsal stringer.
71F3D827-FF29-4861-B985-2F5154C70250.jpeg
A179C990-EC2A-4BCB-9AE5-6DE2CBC6642F.jpeg
May 01, 2020
Window frames
- (3 hours)
Category: Fuselage
Finished right hand side window. Everything fits perfectly; very happy! In one of the pics, you can see an early panel mockup... it's nice to start visualizing, but I've got a ways to go before any of that gets really considered. Skylight is next!
6CA9118A-7B0F-4ED9-8F12-2CE5E34B4F71.jpeg
E6214EAB-A724-4689-896A-965D023399C2.jpeg
Apr 29, 2020
Window frames
- (3.2 hours)
Category: Fuselage
Fitted right side window sheet metal and clecoed to tubing. Acrylic cut to size. I need to finish fitting angle backing, then I can drill acrylic for bolts. Getting there!
E1BB6997-E68D-4C2C-824F-B5B75F778511.jpeg
Apr 28, 2020
Side windows
- (3.3 hours)
Category: Fuselage
Today I finished the left window; all parts are ready for interior paint, and final assembly. I also swaged the two flap cables where they attach to the control horn in the wing root. This is going to need a little more work for clearance, but all seems to work very well. Right window next!
8054501A-14E9-4A27-BB64-6AE332DFA6D4.jpeg
8ED1A96E-375B-44B8-8E77-049D5E114FC7.jpeg
F5BEAFA2-372B-4A71-B80C-0D06C8850FF1.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.